A technician deployed a Communication Server 1000E with dual homing feature configured. Both the T and 2T ports are connected on the media Gateway Controller (MGC) one connection is active to avoid network loops.
Which two statements are true, if the connection to the active port on the MGC is host? (Choose two)
A. The MGC will issue a link down error.
B. The MGC will switch to the active pert.
C. The MGC and CPPM will have no loss of service.
D. The MGC will switch to the active port after 12 seconds.
Click the Exhibit button. A customer has added a new Communication Server 1000E (CS 1000E) Standard Availability to their existing network of CS 1000M Single Group system. They are planning to use some of the spare digital telephone on the new system as well as new IP telephone. With reference to system showing three vacant slots, which two components are required to configure the system so that the digital telephone are supported and can communicate with the IP telephone? (Choose two)
A. TMDI Card
B. IP Line Card
C. Digital Line Card
D. CPPM Signaling Server
A customer with a Communication Server (CS) 1000E 5.5 HA system with IPMG systems and dual ISP 1100 signaling Servers is upgrading their system to release 7x. The ISP 100 Signaling Servers are being replaced with CPDC servers. The contents of the upgrade kit have been installed and the maintenance terminal connection has been established.
What are three other upgrades tasks to be completed? (Choose three)
A. Insert a large system security device.
B. Insert the bootable media into the faceplate.
C. Connect the card to the TLAN/ELAN subnets.
D. Place the CPDC card into an empty card slot.
A customer has completed the security configuration for the security servers in the Avaya Aura integrated system. The System is using Avaya Aura System Manager as the Primary Security Server. The Customer is accessing the Base manager of each Server from the Element list to perform base configuration changes. Aaa Base Managers are accessible except the primary server; When Clicking on the Primary Server, the customer is taken to the System Manager Dashboard page.
What is the recommended course of action for the customer?
A. Log into the System Manager command to access Base Manager.
B. On the system Manager Console, access UCM Roles to change access Privileges.
C. No action is required; System Manager does not have an associated base Manager.
D. Log into Base Manager of the Primary Security server using local-login to access the Base Manager.
A technician is completing the configuration of a new IP node for a system. All files have been transferred and synchronized, and `restart applications' is clicked for the selected servers.
What will this cause the system to do?
A. Reboot the Linux Server running the signaling server.
B. Restart the signaling server application on selected servers.
C. Restart the application on selected servers.
D. Restart Jboss and the Signaling Server applications on the selected servers.
Click the Exhibit Button.
A customer has asked if the Communication Server (CS) 1000 Rls. 7x system can provide Executive users with the ability to selectively drop people that have been added to a conference.
Based on the print-outs and assuming the CSD key has been programmed and the class of service assigned is CDCA, which capabilities are currently available to the user of extension 2006?
A. The user cannot see the conferee display count or selectively disconnect callers.
B. The user can see the conferee display count and can selectively disconnect callers.
C. The user can see the conferee display count but cannot selectively disconnect callers.
D. The user cannot see the conferee display count but can selectively disconnect callers
A customer has successfully installed a Common Processor Media Gateway (CPMG) in a Communication Server (CS) 1000E system. The MGC has registered with the Call Server.
What is displayed on the CPMG LED display to confirm successful registration?
A. The MGC display will read "PASS"
B. The MGC display will read "LOAD"
C. The MGC display will read "Exxx" (E000)
D. The MGC display will show Superloop and shelf number of MG 1000E
Click the Exhibit button.
A technician is performing an upgrade of existing Communication Server 1000E Rls. 6.0 servers from the Deployment Servers. The system is pre-configured and the status is un-deployed. The server has been selected, but the Deployment Actions pull-down list does not include the choice to deploy.
Which two corrective actions must be taken to continue with deployment? (Choose two)
A. Click the radio button associated with the server
B. Click the Disable NFS button
C. Click the Commit button
D. Click the add Linux Server button
A technician is planning to upgrade a customer's existing Communication Server 1000E Rls. 6.0 system. During the upgrade, a CPPM server card from storage will be added to provide an additional signaling server.
Which two statements describes what must be done to the CPPM server card to distinguished it as a signaling Server (Choose two)
A. Set switch 5 to position 1.
B. Set switch 5 to position 2.
C. Install one Compact Flash Drive (RMD) and one Hard Drive (FMD)
D. Install one Compact Flash Drives (one RMD and one FMD)
A Communication Server (CS) 1000E Rls. 7x customer has decided to implement UNIStim security with DTLS.
Which statement regarding UNIStim security with DTLS is true?
A. It is provided by the Secure Multimedia Controller 2450.
B. It encrypts UNIStim signaling between the line Terminal Proxy Server and IP telephones.
C. It provides media security between the IP telephones.
D. It provides security between the Ip telephone and Call Server.