An output of the Validate Scope process is: A. A requirements traceability matrix.
B. The scope management plan.
C. Work performance reports.
D. Change requests.
Configuration identification, configuration status accounting, and configuration verification and audit are all activities in which process?
A. Perform Quality Assurance
B. Direct and Manage Project Work
C. Monitor and Control Project Work
D. Perform Integrated Change Control
The following is a network diagram for a project.

The total float for the project is how many days?
A. 5
B. 9
C. 12
D. 14
Which term describes an assessment of correctness?
A. Accuracy
B. Precision
C. Grade
D. Quality
Project or phase closure guidelines or requirements, historical information, and the lessons learned knowledge base are examples of which input to the Close Project or Phase process?
A. Organizational process assets
B. A work breakdown structure
C. The project management plan
D. Enterprise environmental factors
The project management processes presented in the PMBOK Guide?should:
A. always be applied uniformly.
B. be selected as appropriate by the sponsor.
C. be selected as appropriate by the project team.
D. be applied based on ISO guidelines.
A weighting system is a tool for which area of Conduct Procurements?
A. Plan contracting
B. Requesting seller responses
C. Selecting seller's
D. Planning purchase and acquisition
Which of the following correctly explains the term "progressive elaboration'?
A. Changing project specifications continuously
B. Elaborate tracking of the project progress
C. Elaborate tracking of the project specifications with a change control system
D. Project specifications becoming more explicit and detailed as the project progresses
When a permitting agency takes longer than planned to issue a permit, this can be described as a risk:
A. event.
B. response.
C. perception.
D. impact.
The risk shared between the buyer and seller is determined by the:
A. assumption log.
B. quality checklist.
C. risk register.
D. contract type.