Exam2pass
0 items Sign In or Register
  • Home
  • IT Exams
  • Guarantee
  • FAQs
  • Reviews
  • Contact Us
  • Demo
Exam2pass > IBM > IBM Certifications > C1000-031 > C1000-031 Online Practice Questions and Answers

C1000-031 Online Practice Questions and Answers

Questions 4

What is the advantage of NVMe U.2 flash drives on a Power System E980 SAP HANA BW implementation?

A. They can provide internal boot capability for dual VIOS.

B. They allow for Live Partition Mobility of HANA databases through CAPI 2.0.

C. They can provide AIX Preferred Read storage to reduce SAN latency.

D. They can act as an extension to memory for HANA databases.

Buy Now

Correct Answer: C

Questions 5

Which IBM Power Systems Software provides network firewall services with the local virtualized server to control network traffic between LPARs?

A. PowerSC

B. Trusted AIX

C. PowerVC

D. Trusted Surveyor

Buy Now

Correct Answer: A

Reference: http://www.common.be/system/files/files/Power_Systems_2013_PC.pdf (20)

Questions 6

A customer would like to add a second HMC to an environment which consists of multiple POWER8 and POWER9 processor-based systems.

Which of the following is a requirement for both HMCs to be able to manage all the systems?

A. Both HMCs must be at the same version of HMC Code.

B. Both HMCs must be on the same HMC VLAN.

C. All the POWER8 processor-based systems must be at the same firmware level.

D. Each HMC must be on a dedicated HMC VLAN.

Buy Now

Correct Answer: D

A switch can be partitioned to create a VLAN dedicated to HMC to managed server communication. If HMCs are configured as DHCP servers, there must be only one HMC on each VLAN! If dual HMCs are attached for redundancy, it is unwise to connect the HMCs to two VLANs in the same switch, because if the switch fails both HMCs lose connectivty, thereby defeating the HMC redundancy.

Reference: https://www.ibm.com/developerworks/community/wikis/home/wiki/Power%20Systems/page/ HMC%20reliable%20communication%20and%20doing%20without

Questions 7

An IBM Power System E980 customer is allocating six processor cores to a shared processor pool where they intend to create four partitions as defined below: An IBM i partition with 1.75 processing units and 2 virtual processors ?uncapped An IBM i partition with .60 processing units and 1 virtual processors ?uncapped An IBM i partition with .40 processing units and 1 virtual processors ?uncapped A VIOS partition with 1.25 processing units and 2 virtual processors ?uncapped

How many IBM i licenses are required to support this configuration?

A. 2.75

B. 6.0

C. 4.0

D. 2.0

Buy Now

Correct Answer: D

Questions 8

An existing POWER8 client is requesting redundant hardware, service, and basic virtualization management for their new POWER9 Enterprise server. Their Systems Architect has included one 7063CR1.

Which of the following provides redundancy?

A. An existing 7042-CR8 with firmware at V8.

B. An Integrated Virtualization Manager (IVM).

C. An existing 7042-CR6 with firmware upgraded to V9.

D. An HMC Virtual Appliance

Buy Now

Correct Answer: D

Reference: http://shopdominustech.com/blog/wp-content/uploads/2018/10/redp5496.pdf

Questions 9

A customer wants to configure a Power System E950 with:

36 physical processor cores

24 active processor cores

A partition running AIX with 8 virtual processors and 4.0 processor entitlement.

A partition running AIX with 12 virtual processors and 7.2 processor entitlement.

A partition running Linux with 8 virtual processors and 6.4 processor entitlement.

2 partitions running VIOS, each with 4 virtual processors and 2.0 processor entitlement.

All partitions are uncapped.

All processors are in the default pool. No additional Shared Processor Pools are used.

How many AIX licenses are required?

A. 24

B. 12

C. 20

D. 36

Buy Now

Correct Answer: B

Questions 10

Which open source technology forms the basis for PowerVC?

A. Linux

B. KVM

C. Hadoop

D. OpenStack

Buy Now

Correct Answer: D

Reference: https://kruemcke.wordpress.com/2013/12/04/why-openstack-for-powervc/

Questions 11

A customer is considering implementing NovaLink for critical Enterprise workloads.

Where will NovaLink run?

A. As an appliance connected to the FSP.

B. On the HMC.

C. As a job in each dual VIOS.

D. In a separate Linux partition on the managed server.

Buy Now

Correct Answer: D

Questions 12

What is the minimum memory capacity of a Power System E980?

A. 32TB

B. 64TB

C. 128TB

D. 192TB

Buy Now

Correct Answer: B

Questions 13

To improve response times for an OLAP application, a POWER9 customer requires a SAN-attached storage solution with microsecond latency and highest density per rack.

Which of the following supports these requirements?

A. FlashSystem 900

B. IBM ESS

C. IBM Nutanix

D. Storwize V7000

Buy Now

Correct Answer: A

Exam Code: C1000-031
Exam Name: IBM Power Systems Scale-Up Technical Sales
Last Update: Jul 06, 2026
Questions: 101

PDF (Q&A)

$45.99
ADD TO CART

VCE

$49.99
ADD TO CART

PDF + VCE

$59.99
ADD TO CART

Exam2Pass----The Most Reliable Exam Preparation Assistance

There are tens of thousands of certification exam dumps provided on the internet. And how to choose the most reliable one among them is the first problem one certification candidate should face. Exam2Pass provide a shot cut to pass the exam and get the certification. If you need help on any questions or any Exam2Pass exam PDF and VCE simulators, customer support team is ready to help at any time when required.

Home | Guarantee & Policy |  Privacy & Policy |  Terms & Conditions |  How to buy |  FAQs |  About Us |  Contact Us |  Demo |  Reviews

2026 Copyright @ exam2pass.com All trademarks are the property of their respective vendors. We are not associated with any of them.