An administrator wants to make sure that time remaining on work items in a plan view are consistent with
the estimate.
Which plan check ensures this?
A. Invalid Estimate Check
B. Planning Problems Check
C. Traditional Planning Check
D. Cross-Project Planning Problems Check
A user would like to be kept informed of changes that occur on a particular work item. How can the user accomplish this?
A. Subscribe to the work item.
B. Use a data warehouse report.
C. Review the Open Work Items widget.
D. Link the work item to a planning item.
An organization plans to have a large number of project areas. The process engineering team plans to Change roles as well as the associated permissions. The organization does not allow changes to a project area process directly on the production system and needs to minimize the work to deploy a new process to all the project areas. How can this be accomplished?
A. Use Process Sharing.
B. Extract the Process Templates.
C. Export and import the Process Templates.
D. Copy process XML to each production project area.
A user wants to add widgets from external sources to a RTC Dashboard. Which type can be added?
A. Apache Widget
B. Open Social Gadget
C. Google Open Gadget
D. External Content Widget
A user needs to import work items into a project area using the RTC Eclipse client. Which file content type can be used?
A. XML document
B. Rich Text document
C. File Interchange format
D. Comma Separated Value
The scrum master moves a story in the Quick Planner from the backlog to a sprint plan. Which attribute on the story was automatically updated by this action?
A. Release
B. Owned by
C. Planned for
D. Filed Against
A user wants to create an enumeration. There is a requirement to allow users with the appropriate
permissions to add new literals from the Work Item editor.
Where does the enumeration need to be stored?
A. Database
B. Process Template
C. Repository Workspace
D. Process Specification
A user would like to set up a variable with a value that can be referenced in other fields of the Build
Definition editor.
What must be added to the build definition?
A. Labels
B. Variables
C. Attributes
D. Properties
An administrator is designing the representation of the following: 1) which team is responsible for work items 2) in which build the defects were discovered 3) the timeframe for the work item to be completed
Which of the following shows the correct relationships?
A. Categories: Found In Releases: Planned For Iterations: Filed Against
B. Team Areas: Planned For Releases: Filed Against Iterations: Found In
C. Categories: Filed Against Releases: Found In Iterations: Planned For
D. Team Areas: Filed Against Releases: Planned For Iterations: Found In
A developer is working on a task with outgoing change sets in a loaded repository workspace when a manager identifies a new, critical task that must be performed immediately. There are currently no unresolved changes. Without creating another repository workspace, how can the developer safely work on the critical task without losing the pending changes of the initial task?
A. The user suspends the current change sets and starts working in a new change set.
B. The user reloads the repository workspace and starts working in a new change set
C. The user creates a new change set, selects it as the current change set and checks in all changes.
D. The user loads the repository workspace in a different client and starts working in a new change set.