You are analyzing the data transfer of the cost center of an equipment. What are the possible data origins? Note: There are 2correct answers to this question.
A. The reference functional location of the superior functional location
B. The individual maintenance of the cost center in the equipment master record
C. The cost center of the related maintenance work center
D. The cost center of the superior equipment
What do you need to configure to enable entries in the action log ofan equipment?
A. Select the time segment check box for the equipment category.
B. Define an additional business view for the equipment category.
C. Define the corresponding history-related field for the equipment reference category.
D. Activate the change documents for the equipment category.
What is a valid partner type within the partner determinationprocedure?
A. Purchasing organization
B. Business partner (gen.
C. Purchasing group
D. Vendor (external)
You want toassign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?
A. Free assignment of material is always possible without any prerequisites.
B. Assign the header material of a material BOM to the equipmenttask list header.
C. Assign the header material of a material BOM as assembly to atask list operation.
D. Assign the BOM usage for free assignment of material in Customizing.
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2correct answers to this question.
A. Shift factors
B. Start counter reading
C. Estimated annual performance
D. Scheduling period
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.
A. Assign a piece ofequipment with an allocated measuring point to a task list operation.
B. Assign an inspection lot to the task list header.
C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
D. Assign an inspection document as PRT tothe task list operation.
You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use?
A. Maintenance work center
B. Maintenance planner groups
C. Location
D. Controlling area
Which of the following is a prerequisite for external refurbishment?
A. Select the material group for externally refurbished materials.
B. Activate the subcontracting indicator in an external activity.
C. Define the order type for external refurbishment.
D. Create the purchasing info record for the external provider.
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this?
A. Offset
B. Subsequent buffer
C. Hierarchy
D. Package sequence
Whichoperations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.
A. Change the priority.
B. Cancel status Released.
C. Book a goods receipt.
D. Change the estimated costs.