Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
A. When multiple operations are maintained for one product
B. When alternate resources are used within one operation
C. When multiple planned orders exist on one resource
D. When multiple production versions are maintained for one product
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have? (Choose 2)
A. Model a transportation resorce in the location master.
B. Model a seperate resource in the production data structure.
C. Model a resource inbound in the location master.
D. Model a handling resource in the location master and goods receipt time in the material master.
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements? (Choose 2)
A. Planed delivery time
B. Operation duration
C. In-house production time
D. Total replenishment lead time
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? (Choose 2)
A. Run MRP with quota arrangement.
B. Run MRP with automatic selection of production version.
C. Assign planned orders manual lying the planning table.
D. Run PP/DS heuristics for repetitive manufacturing.
Which standard item categories can you select inside a bill of material (BOM)? (Choose 2)
A. Non-stock item
B. Work item
C. Variable-size item
D. WBS item
What happens to this dependent requirement when you convert the planned order into a production order?
A. They are converted into a schedule line.
B. They are converted into a reservation.
C. They are converted into a production order.
D. They are converted into a planned order.
What does a line hierarchy in repetitive manufacturing represent?
A. A production line with a parallel sequence in the routing
B. A production line with prioritized alternative work centers
C. A production line with more than one work center
D. A production line with an alternative sequence in the routing
In the Schedule Production app which setting can you make for the planning strategy?
A. Fitness level
B. Scheduling control
C. Fixed pegging
D. Direction
E. Planning mode
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
A. Production order release
B. Material requirements planning
C. Backflushing
D. Kanban
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
A. Fill up based on the lot size procedure
B. Fill up to the maximum stock level
C. Fill up to the safety stoc level
D. Fill up to the reorder stock level