Which of the following values can be calculated using result analysis? Note: There are 3 correct answers to this question.
A. Cost of sales
B. Reserves for unrealized costs
C. Cost of goods manufactured
D. Gross margin
E. Work in progress
In which module do you process profit center allocations in SAP S/4HANA?
A. Product cost accounting
B. General ledger accounting
C. Account-based profitability analysis
D. Cost center accounting
Which setting in the cost center master data do you use to assign the same attributes to similar cost center?
A. Cost center category
B. Cost center type
C. Object class
D. Standard hierarchy node
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.
A. The availability of funds using overall plan value
B. The availability of funds according to tolerance limits
C. The availability of funds in object currency
D. The availability of funds on period level
How do you define the relationship between an operating concern and a controlling area?
A. Many-to-many (N:M)
B. Many-to-one (N:1)
C. One-to-many (1:N)
D. One-to-one (1:1)
Which of the following statements are applicable to automatic account assignment in SAP S/4HANA? Note: There are 2 correct answers to this question.
A. It can be overwritten in the application.
B. It can be defined for postings on general ledger accounts of secondary costs type.
C. It takes precedence over validation and substitution.
D. It can be defined for postings on general ledger accounts of primary costs type.
To which object do you assign a costing sheet?
A. Valuation variant
B. Transfer control
C. Cost component structure
D. Costing variant
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?
A. Costing type
B. Reference variant
C. Transfer control
D. Costing version
How do you maintain number range intervals in Controlling?
A. By account type
B. By cost element category
C. By business transactions
D. By document type
Why would you use manual cost allocation in Controlling? Note: There are 2 correct answers to this question.
A. To run simple allocations of actual data
B. To run simple allocations of plan data
C. To correct secondary postings
D. To allocate costs using an allocation cycle