Exam2pass
0 items Sign In or Register
  • Home
  • IT Exams
  • Guarantee
  • FAQs
  • Reviews
  • Contact Us
  • Demo
Exam2pass > Six Sigma > Six Sigma Certifications > CLSSBB > CLSSBB Online Practice Questions and Answers

CLSSBB Online Practice Questions and Answers

Questions 4

Find the value of (6) in the ANOVA table. Assume:

A. 16.4

B. 3.2

C. 18.6

D. 23.2

E. 4.54

F. 12.2

G. 0.525

H. 2.82

I. 1.48

J. 35.4

K. 0.10

L. 0.05

M. 0.01

N. 0.005

O. 0

Buy Now

Correct Answer: J

Questions 5

Calculate the Rolled Throughput Yield of this process using this data. Data. unit input: 1450, unit output: 1390, defects repaired. 320, scrap: 60

A. 71.33%

B. 72.66%

C. 73.79%

D. 77.93%

Buy Now

Correct Answer: B

Questions 6

A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________.

A. Value Stream Map

B. FMEA

C. Pareto Chart

D. Standard Operating Procedure

Buy Now

Correct Answer: A

Questions 7

Data that can be measured on a continuum and has meaningful decimal subdivisions are __________ data.

A. Continuous

B. Surplus

C. Discrete

D. Variable

Buy Now

Correct Answer: A

Questions 8

The English words used for the 5S's are __________, _____________, Shining, Standardizing and Sustaining. (Note: There are 2 correct answers).

A. Shaping

B. Sorting

C. Shifting

D. Straightening

Buy Now

Correct Answer: BD

Questions 9

Which of these graphical presentations displays the values of each individual reading?

A. Histogram

B. Box Plot

C. Stem and Leaf Plot

D. X-Y Diagram

Buy Now

Correct Answer: C

Questions 10

Which statement is NOT correct about the Fitted Line Plot shown here?

A. The independent variable is the reactant

B. If the reactant was 6 units, with 95 % confidence we would expect a minimum yield of 100 units

C. With at least 95% confidence, we can expect less than 10 units of Yield when the reactant is at a value of 1

D. A reactant value between 2 and 4 units yields around 20 to 40

E. When the reactant increases, the expected yield would increase

Buy Now

Correct Answer: D

Questions 11

Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?

A. Money is being spent

B. Waste is being generated

C. Waste is being calculated

D. Waste is being eliminated

Buy Now

Correct Answer: B

Questions 12

In the late 1980's ______________ coined the name Six Sigma for a methodology that had its origins at Motorola for quality related work being done there.

A. Joseph Juran

B. William Smith

C. Mikel Harry

D. Bill Lary

Buy Now

Correct Answer: B

Questions 13

In order for a problem to be solved correctly, which of the following must occur first?

A. The problem must be defined

B. Relevant data must be gathered

C. The measurement system must be validated

D. The process must be mapped

Buy Now

Correct Answer: A

Exam Code: CLSSBB
Exam Name: Certified Lean Six Sigma Black Belt (LSSBB)
Last Update: Jun 06, 2025
Questions: 639

PDF (Q&A)

$45.99
ADD TO CART

VCE

$49.99
ADD TO CART

PDF + VCE

$59.99
ADD TO CART

Exam2Pass----The Most Reliable Exam Preparation Assistance

There are tens of thousands of certification exam dumps provided on the internet. And how to choose the most reliable one among them is the first problem one certification candidate should face. Exam2Pass provide a shot cut to pass the exam and get the certification. If you need help on any questions or any Exam2Pass exam PDF and VCE simulators, customer support team is ready to help at any time when required.

Home | Guarantee & Policy |  Privacy & Policy |  Terms & Conditions |  How to buy |  FAQs |  About Us |  Contact Us |  Demo |  Reviews

2025 Copyright @ exam2pass.com All trademarks are the property of their respective vendors. We are not associated with any of them.