What document is typically created to launch a project?
A. Bill of Materials
B. Project Charter
C. Work Breakdown Structure
D. Budget
A business traveler from North America is in Europe. The hotel only provides coverage in 2.4 GHz. The traveler connects to the hotel's SSID and notices an AP in the hotel room. However, the laptop reports a very low RSSI when connected. The traveler does not have the same problem when connecting in the lobby. What would be the most likely cause of the low RSSI in the hotel room?
A. The AP in the room is using ZigBee instead of Wi-Fi.
B. The AP in the room is transmitting on channel 13 and the traveler associated to a non-channel 13 AP located elsewhere.
C. The switchport that the AP is connected to is only capable of transmitting at 10 Mbps.
D. The AP in the room is using Bluetooth instead of Wi-Fi.
You're about to deploy an Enterprise-class VoWLAN infrastructure. You need to ensure that QoS is properly configured throughout the network. What Access Category (AC) should voice frames/packets use?
A. AC_VI
B. AC_VO
C. AC_BE
D. AC_BK
Why should band steering algorithms allow stations to connect to the 2.4 GHz band after some number of ignored Probe Requests?
A. Because the FCC requires it.
B. Because some clients are persistent clients that will not move on to the 5 GHz band.
C. Because the 802.11 standard requires it.
D. Because the AP will experience a buffer overflow if they do not eventually respond with a Probe Response.
When deploying APs outdoors, what additional component needs to be used that is not needed indoors?
A. Antennas
B. NEMA enclosures
C. Ethernet cables
D. PoE
Which document provided to your customer should include all devices and parts that are going to be used during the deployment of their WLAN infrastructure?
A. SoW
B. BoM
C. Design report
D. Project plan
When installing APs on high ceilings, what should be the most common PPE to be used?
A. Hardhat, high visibility vest and body belt
B. Glasses, gloves and jacket
C. Clean suits, masks and glasses
D. Clean suits, gloves and jacket
During your first pre-deployment meeting with the deployment team, you hand out the full design documentation to all of them. What's your primary goal during this meeting?
A. To explain design decisions and ensure understanding of design documents.
B. To discuss AP functionality.
C. To explain how Wi-Fi works.
D. To justify the budget.
What are the deliverables to your customer after successfully implementing a WLAN infrastructure?
A. Digital or physical assets, guides, floorplans and configuration documents
B. Project Charter
C. Facility blueprints
D. Nothing is required. The implemented WLAN was deliverable
During a validation site survey, you realize that the installers mounted some of the APs above the ceiling. They said that this was a request from the building architect due to aesthetics constraints. During the requirements gathering, you weren't advised about any aesthetics constraints from the main stakeholder of the project. What should you do in this case?
A. Advise the stakeholder that WLAN performance requirements will not be met and a new design process will be needed to meet the requirements.
B. Leave it as it is and allow automatic channel management to correct any issues.
C. Increase the output power on all APs by 6 dB immediately.
D. Remove all external antennas and use only the internal antennas to reduce multipath.