You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
A. SYCM (Simplification Database Content)
B. SAT (Runtime Analysis)
C. ATC (ABAP Test Cockpit)
D. SE80 (Object Navigator)
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
A. Keep archiving on during the whole procedure.
B. Use the Near Zero Downtime Maintenance Technology (NZDM).
C. Reuse a profile for the shadow instance from a previous run.
D. Choose the instance number of the shadow instance.
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
A. Kernel for target release, Windows, SAP MaxDB
B. Kernel for target release, Linux, SAP HANA
C. Kernel for target release, Windows, SAP HANA
D. Kernel for source release, Windows, SAP MaxDB
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
A. 750
B. 700
C. 731
D. 740
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
A. An upgrade of the software components is performed, without changing the database type.
B. A change of the database type is performed, without changing the software components.
C. An SAP S/4HANA conversion is performed, without adapting the customer data.
D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
A. It contains a troubleshooting section
B. It is target release specific
C. It contains a section "free space requirements"
D. It is a database-specific document
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
A. EU_IMPORT_ALL
B. EU_CLONE_MIG_DT_CREATE
C. EU_CLONE_MIG_SOT_RUN
D. EU_CLONE_MIG_DT_RUN
During the upgrade of your development system, you run into the adjustment of non- dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
A. SUM continues with the next phase and your modifications are kept as In the start release
B. SUM continues with the next phase and your modifications are lost
C. Before continuing with the next phase SUM asks for a modification adjustment transport
D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
A. Phases DIFF*
B. Phase DOWNCONF_DTTRANS
C. Phase RUN_RSPTBFIL _ISUTABU
D. Phases EU_IMPORT*
E. Phase RUN_RSDBSCPY
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There are 2 correct answers to this question.
Response:
A. Check the "Charts Control Center" in the SUM UI
B. Check logs for jobs starting with "RSUPG_SGEN" in the system
C. Check the log files written under "SUM\abap\log"
D. Check the dump size of the database export on disk