Place the preventive measure steps in the correct order.
Select and Place:

Select and Place:

Why is it considered a best practice to use tools such as HP Smart Update Manager (SUM) and Virtual Connect Support Utility (VCSU) to deploy firmware components?
A. These tools check the dependencies and limitations.
B. The tools are compatible with all versions of firmware.
C. These are the only tools that can be used to work with Virtual Connect Enterprise Utility (VCEU).
D. These tools are version compatible by design.
What is a DDR3 Memory population rule to follow for Gen8 servers?
A. If only one processor is installed in a two processor system, only half of the DIMM slots are available.
B. DIMMs of different voltages cannot be mixed in the same bank.
C. DIMMs of different speed grades can be mixed.
D. UDIMMs, RDIMMs, or LRDIMMs can be mixed.
Which capability does the Unified Extensible Firmware Interface (UEFI) provide in ProLiant Blade servers?
A. advanced diagnostics for fault isolation
B. PXE boot device selection
C. shortcut keys under OS control
D. function key selection during startup
Which statement is true about creating a repository for implementing Version Control Repository Manager (VCRM)?
A. There can be only one repository in the customer's environment.
B. Servers with Version Control Agents (VCAs) must reside on the same subnet as the repository
C. There can be multiple repositories in the customer's environment.
D. There must be an HP SIM server associated with the repository
Which full-height device bays are in Zone 3 of a c7000 enclosure?
A. 1 and 2
B. 3 and 4
C. 5 and 6
D. 7 and 8
When should a performance baseline be captured?
A. after the initial installation of the equipment, during normal daily operation
B. after the initial installation of the equipment, during peak operating conditions
C. before and after each step of the initial installation of the equipment
D. three times a day during the first week following the initial installation of the equipment
A c7000 connected to an MDS600 is not working as expected. Several times a day, blades lose connectivity to their assigned disks. Your manager asks you to develop an action plan according to the HP troubleshooting methodology. What needs to be included in the action plan? (Select three.)
A. necessary steps to implement the solution
B. order number of the solution
C. elevation plan
D. special local regulatory information
E. solution to workaround issue with third-party hardware
F. possible root cause of the problem
Which mezzanine card is compatible with the HP ProCurve 6120XG interconnect?
A. HP NC326m PCIe Dual-Port 1Gb Server Adapter
B. Emulex LPe1105-HP 4Gb Fibre Channel HBA
C. HP 4X QDR IB CX-2 Dual Port Mezz HCA for HP BladeSystem c-Class
D. HP StorageWorks 80GB IO Accelerator for BladeSystem c-Class
What should a system engineer use to back up the configuration for a BladeSystem enclosure? (Select two.)
A. Onboard Administrator GUI - Configuration Scripts option
B. Onboard Administrator GUI - Rack Overview option
C. Insight Display - Enclosure Settings
D. Insight Display - USB Menu
E. Insight Display - Enclosure Info