HOTSPOT
A Synergy integrator has installed a new frame into a rack with two existing frames in the customer's environment. Click where the integrator should verify that the cabling for the management ring was completed correctly.
Hot Area:

HOTSPOT
A customer needs to incorporate the HPE Synergy D3940 Composable Storage Module into its environment. Click the adapter associated with the fabric in which the customer should install the P542 controller.
Hot Area:

Using composable features, what should a Synergy integrator do to resolve high memory utilization on an HPE Synergy compute module?
A. Use the API to optimize the memory allocation from the HPE Synergy fluid resource pool.
B. Increase the allocated physical memory from the HPE Synergy fluid resource pool, and then reboot the compute module.
C. Take a small outage and reassign the HPE OneView server profile to a higher capacity compute module.
D. Increase the reversed physical memory in the Server Profile (SP), and then reapply.
A customer attempts to use an HPE Synergy Composer to discover an HPE BladeSystem c7000 enclosure. The customer is unable to migrate the HPE BladeSystem c7000 enclosure into the HPE Synergy Composer. What is preventing the customer from completing this task?
A. The migration must be initiated from the HPE OneView managing the HPE BladeSystem c7000 enclosure.
B. The HPE BladeSystem c7000 enclosure must be cabled to the Synergy management network.
C. The HPE OneView managing the HPE BladeSystem c700 enclosure must be upgraded to HPE OneView 3.0 before the Synergy Composer can migrate.
D. The Synergy Composer only supports HPE Synergy products.
A customer that uses a third-party storage array plants to set up Fibre Channel (FC) zones with the new HPE Synergy 12000 Frame. Which tool creates the FC zones in a Synergy solution?
A. storage page in the Synergy console
B. Virtual Connect module manager
C. corresponding SAN manager
D. Storage array command line utility
A customer has purchased 15 Synergy Frames with the following components:
150 HPE SY 480 compute modules
15 HPE Synergy D3940 storage modules with 40 disks each
6 Image Streamers
6 Virtual Connect SE 40Gb F8 modules
24 10Gb Interconnect Link Modules
How many frames can the configuration have for the Logical Enclosure?
A. 3 frames
B. 4 frames
C. 5 frames
D. 6 frames
When should IP addresses be assigned using an IPv4 address pool in the Composer? (Choose two.)
A. when configuring management NICs in an operating system
B. when booting to an iSCSI initiator with Image Streamer
C. when PXE booting from the deployment server
D. when configuring Composer appliances
E. when configuring interconnect modules
What should a Synergy integrator do to resolve an unresponsive HPE Synergy Frame Link Module?
A. Press the reset button on the front of the HPE Synergy Frame.
B. Remove and reinstall the Frame Link Module in the original bay.
C. Remove and reinstall the Composer.
D. Disconnect and reconnect the Frame Link Module from the management network.
A customer has forgotten the password for the HPE OneView Appliance controlling the customer's HPE Synergy Infrastructure.
Where can the customer reset the password with the assistance of HPE Support?
A. Maintenance Console screen
B. FLM Access to Synergy Console
C. Virtual Center server
D. Front Access Panel to Synergy Console
A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.
Which procedure should the Synergy integrator use to address the customer's concern?
A. Connect FLMs from all frames into a management ring. Then connect the management ring to the customer's management network using two uplinks.
B. Connect FLMs from all frames to two external switches for redundancy. Then connect the two uplinks from the two switches into the customer's management network.
C. Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then connect the uplink from the two switches into the customer's management network.
D. Connect the RJ-45 front ports of each frame to an external switch. Then connect the uplink from the external switch into the customer's management network.