You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.
B. Create an inclusive restricted product list for United States and add the motorcycle part to the list.
C. Create an exclusive restricted product list for California and add the motorcycle part to the list.
D. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.
You need to set up the correct production solution for the assembly area. Which solution should you implement?
A. Standard warehousing with Manufacturing execution
B. Standard warehousing for all transactions
C. Advanced warehousing for all transactions
D. Advanced warehousing with Manufacturing execution
A manufacturing plant uses Lean process. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
1.) Create a vendor warehouse for the subcontracting vendor 2.) Create a vendor resource and add it to a new work cell for outsource painting 3.) Create a production flow transfer activity and specify the vendor warehouse as the target
warehouse
Does this solution meet the goal?
A. Yes
B. No
You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?
A. Phantom
B. Vendor
C. Item
D. Pegged supply
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
The company requires that employees register time against each machine on the shop floor.
You need to configure the system so that employees can register time.
Which two configurations must be set up? Each answer represents a partial solution.
NOTE: Each correct selection is worth one point.
A. electronic timecard parameter
B. registration workflow
C. machines as a resource
D. time registration workers
HOTSPOT
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

HOTSPOT
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

HOTSPOT A manufacturing company uses Dynamics 365 Supply Cham Management. The company identifies a bill of materials (BOM) item that needs to be recalled for a product
The engineering department needs to link customer support incidents and knowledgebase articles related to the product change.
Other items affected by this change must reference the same support incidents and knowledgebase articles.
You need to recommend features to facilitate this business process.
Which features should you recommend? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

HOTSPOT
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

DRAG DROP
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source. Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge
scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
