You have just configured the customer's first SVM with a LIF IP 10.0.0.10/24. The customer's DNS IP address is 172.16.0.250 and you are unable to ping it from the NetApp storage system, but you are able to ping the gateway and everything else works.
In this scenario what is the problem?
A. You need to have the DNS server on the same subnet as the LIF IP address.
B. You need to add a static gateway to the LIFs routing group.
C. You need to have the customer check the cable.
D. You need to add an IPspace and domain broadcast to the port.
You want to install a new clustered Data ONTAP 8.3 system with a FA8080. The customer has unused licenses available from a clustered Data ONTAP 8.1 system.
What should be considered in this scenario?
A. You can use your licenses from the clustered Data ONTAP 8.1 system for the new clustered Data ONTAP system.
B. You must call NetApp Support for evaluation license keys.
C. You can use your license from the clustered Data ONTAP 8.1 system for about 90 days.
D. In clustered Data ONTAP 8.2 and later, use node-specific license keys that will only install on the controller for which they were purchased.
According to NetApp best practices, which two sets of protocols would be assigned to the same storage virtual machine (SVM)? (Choose two.)
A. FCP, NFS
B. CIFS, iSCSI
C. NFS. CIFS
D. FCP, iSCSI
You are asked to complete a 2-node installation of a FAS8060 cluster running clustered Data ONTAP 8.3. The hardware has been installed and the cluster has been configured. AutoSupport testing has not been successful because NetApp Support cannot see any messages, and the customer does not have any messages in their inbox.
Which two actions should be performed to test the functionality from the NetApp cluster? (Choose two.)
A. Verify that the network gateway responds to a ping request.
B. Verify that the mailhost responds to a ping request.
C. Verify that the domain controller responds to a ping request.
D. Verify that the cluster interconnect switches respond to a ping request.
You are preparing to install a new 4-node cluster for your customer. They want to use NetApp CN1610 cluster switches that they previously purchased.
Which software must be downloaded to ensure that you are well prepared for this installation?
A. You must download CN1610 firmware and RCF files compatible with the clustered Data ONTAP version that your customer wants to use.
B. You must download the Cisco configuration files compatible with the clustered Data ONTAP version that your customer wants to use.
C. You must download ATTO Fibre Bridge firmware.
D. You must download the System Setup tool.
When you create a single-node cluster, which statement is correct about the cluster base license key?
A. A single-node cluster does not need any cluster-base license key.
B. A single-node clustered Data ONTAP 8.1 license key is seven characters long.
C. Clustered Data ONTAP 8.2 and 8.3 license keys are 14 characters long.
D. A single-node cluster requires a cluster base key to use a cluster.
You are creating a first data aggregate on the fourth node of a clustered Data ONTAP system that has only 600 GB SAS disks.
According to the NetApp naming convention, what is the appropriate name for the aggregate?
A. aggr10
B. n04.SAS_aggr10
C. n04_SAS_aggr01
D. n04-aggr01-SAS
The full boot cycle of the CN1610 should take approximately 50 seconds.
What should you do to minimize the interruption?
A. Remove all of the cables from the CN1610 CL1 switch, and then connect them to different ports on the CN1610 CL2 switch.
B. You can migrate the cluster LIFs from the switch that is to be rebooted, and then revert the cluster LIFs after the switch has finished rebooting.
C. You can migrate Data LIFs to different ports on different nodes.
D. On each respective switch, use the network interface migrate command to migrate the inter- switch links.
Click the Exhibit button.

A customer has a 4-node cluster and wants to know what will happen to their data if one of the two HA pairs goes down. Epsilon is configured and working properly and is owned by Node1. Nodes 3 and 4 have failed as shown in the exhibit.
What happens to the customer's data that is owned by the HA pair 3 and 4?
A. Nodes 1 and 2 will takeover the storage for nodes 3 and 4 and continue running normally.
B. The cluster will go into maintenance mode and only allow administrators access to data on nodes 1 and
2.
C. The entire cluster will panic and no data will be accessible.
D. The customer will lose access to the data on nodes 3 and 4 but will still have access to storage in nodes 1 and 2.
You have completed the installation and verification of the cluster for a customer.
What is required to complete the event?
A. Present the customer with the posters included in the boxes.
B. Call your manager to let them know that you are finished.
C. Have the customer call NetApp Support to let them know that the installation is complete.
D. Have the contact sign a document saying that the installation is complete.